Late delivery penalty clause calculator
Most supply contracts include a late delivery penalty clause — a credit you're owed when a supplier delivers late. Enter one real order below and see what yours is worth in under a minute.
Loading…
What is a late delivery penalty clause?
A late delivery penalty (sometimes called a liquidated damages clause, or a late-delivery remedy) is a term in a supply contract that entitles the buyer to a credit when a supplier delivers after the agreed date. It's not a dispute or a goodwill gesture — it's a contractual entitlement both parties already agreed to when the contract was signed.
Most UK/EU supply contracts structure it the same way: a percentage of the order value, charged per week (or per day) the delivery runs late, usually capped at somewhere between 5% and 10% of the order value so the credit stays proportionate rather than punitive.
How to calculate a late delivery penalty
The formula behind the calculator above is:
weeks late × contractual rate per week, capped at the contract's maximum percentage, × order value
A worked example: a £120,000 order, delivered 18 days (so 3 weeks, rounding up) late, with a 0.5%-per-week rate capped at 7.5%. 3 weeks × 0.5% = 1.5% of £120,000 = £1,800 owed — before the cap is anywhere near reached.
This calculator rounds up to the next full week — 18 days becomes 3 weeks, not 2.57 — because most UK/EU clauses are worded "per week or part thereof," which triggers the full week's rate the moment a delivery runs even a day into it. If your contract instead counts only complete weeks elapsed, or prorates by the day, the figure will come out lower; check your clause's exact wording if the number here looks high.
What evidence do you need to make the claim?
- The contract clause itself, with the rate and cap wording.
- The purchase order, showing the agreed delivery date and order value.
- The goods-receipt record, showing the actual delivery date.
All three need to line up before a claim is worth raising — which is exactly why most buyers never check: cross-referencing a clause against hundreds of individual deliveries by hand isn't realistic.
What if you have hundreds of orders, not one?
This calculator checks a single order. Covenn uploads your contract, extracts the remedy clause automatically with a confidence score, then matches it against every purchase order and goods-receipt record you import — surfacing every late delivery that triggered a credit, not just the one you happened to check.
Run a free audit on my whole supplier ledger →
Also dealing with short shipments or overcharges? See the short shipment claim calculator or the supplier overcharge calculator.
Frequently asked questions
How is a late delivery penalty calculated?
Most contracts set a percentage of the order value as a credit for each week (or day) a delivery runs late, usually capped at a maximum percentage. This calculator applies exactly that formula: weeks late × your contract's rate, capped at your contract's maximum.
Is a late delivery penalty the same as liquidated damages?
Often, yes — many contracts use "liquidated damages" as the formal term for a pre-agreed late-delivery credit. UK courts generally enforce these as long as the amount is a genuine pre-estimate of loss rather than a punitive penalty, which is why most clauses are capped.
What if my contract doesn't cap the penalty?
Some don't. Leave the cap field high (e.g. 100%) to effectively remove it, though in practice most buyers still only claim what the clause's rate actually produces.
Does this work for every contract?
This calculator assumes a standard rate-per-week-late structure, which covers most UK/EU supply contracts. If your contract uses a different structure (a flat fee, a sliding scale, or something bespoke), the underlying number may differ — a full audit reads the actual clause wording rather than assuming a structure.